AFGHANISTAN-TAJIKISTAN BRIDGE OVER PYANDZH RIVER

U.S. Army Corps of Engineers Afghanistan Engineer District

This site is in support of the design-build solicitation by the U. S. Army Corps of Engineers (USACE), Afghanistan Engineer District (AED) for the Afghanistan-Tajikistan Bridge over the Pyandzh River (Solicitation No. W917PM-04-R-0017).

This site provides a project overview and files for project documents prepared by Michael Baker Jr., Inc. under Contract to USACE.

OVERVIEW

A vehicular/pedestrian walkway bridge with access roads and approach ramps will be final designed and constructed by the successful Offeror across the Pyandzh River between Afghanistan and Tajikistan. The location of the bridge, access roads and approach ramps are between Niznji Pianj, Tajikistan and Sher Khan, Afghanistan.

The bridge, access roads and approach ramps will be designed and constructed by the successful Offeror at the location shown and discussed in the reports entitled “Final Hydrographic – Topographic Survey Report for Afghanistan – Tajikistan Bridge Over the Pyandzh River” dated January 2004 and “Final Geotechnical Information Research Report for Afghanistan – Tajikistan Bridge Over the Pyandzh River” dated January 2004.

Details of the bridge, access roads and approach ramps are also contained in these reports. Copies of these reports are provided as “INFORMATION ONLY”.

Also, a Planning and Programming report was prepared prior to the above reports being written. This report is entitled “Planning & Programming, Bridge Site Survey Report for Afghanistan-Tajikistan Bridge Over Pyandzh River” dated July 2003. However, this report discusses three (3) possible site locations. Site Location 3 as shown and discussed in this report was selected as the approximate site location for the project. A copy of this report is provided for “INFORMATION ONLY”.

A geotechnical site investigation including subsurface borings and test pit to obtain soil and rock samples for geotechnical laboratory testing was conducted during the summer of 2004. The findings and recommendations are documented in the "FINAL Geotechnical Engineering Report for Afghanistan-Tajikistan Bridge Over the Pyandzh River" dated September 2004. This report is provided for “INFORMATION ONLY”.

A concept design (35%) package has been developed and consists of the “FINAL Concept Design Analysis Report for Afghanistan-Tajikistan Bridge Over the Pyandzh River" dated September 2004, and the "Afghanistan-Tajikistan Bridge, Shir Khan, Afghanistan to Nizhniy Pyandzh, Tajikistan, 35% Design Submittal" (Drawings)” dated August 2004, Revision 1. These are available for download.

It should be noted that the Geotechnical Engineering Report, the Concept Design Analysis Report, and the Concept Design Drawings were previously available for download as DRAFT versions. A summary of the changes made in the DRAFT versions of these documents is also available for download. Please see below.

DOCUMENTS AVAILABLE FOR DOWNLOAD

The following documents may be downloaded from this site. Additional documents will be added as they become available.

Aerial View of Bridge Site (Large File .TIF - 31Mb)

Aerial View of Bridge Site (Medium File .PDF - 19Mb)

Aerial View of Bridge Site (Small File .JPG - 7Mb)


“Planning & Programming, Bridge Site Survey Report for Afghanistan-Tajikistan Bridge Over Pyandzh River” dated July 2003.   (Format: PDF  Size: 48Mb)   * Note that this report discusses three (3) possible site locations. Site Location 3 as shown and discussed in this report was selected as the approximate site location for the project, and subsequently modified. A copy of this report is provided for “INFORMATION ONLY”.

“Final Hydrographic – Topographic Survey Report for Afghanistan – Tajikistan Bridge Over the Pyandzh River” dated January 2004.    (Format: PDF  Size: 37Mb)

“Final Geotechnical Information Research Report for Afghanistan – Tajikistan Bridge Over the Pyandzh River” dated January 2004.   (Format: PDF  Size: 5.8Mb)

"FINAL Concept Design Analysis Report for Afghanistan-Tajikistan Bridge Over the Pyandzh River" dated September 2004. (Format: PDF  Size: 22Mb)

“FINAL Geotechnical Engineering Report for Afghanistan-Tajikistan Bridge Over the Pyandzh River" dated September 2004. (Format: PDF  Size: 35.5Mb)

“DRAFT to FINAL Document Changes, Afghanistan-Tajikistan Bridge Over the Pyandzh River" dated September 3, 2004. (Format: PDF  Size: 140Kb)

 

35% Design drawings are available for download in *.pdf, *.dwg (AutoCAD), and *.dgn (Microstation) file formats as provided below.

"Afghanistan-Tajikistan Bridge, Shir Khan, Afghanistan to Nizhniy Pyandzh, Tajikistan, 35% Design Submittal" (Drawings)” dated August 2004, Revision 2. (Format: PDF  Size: 2.5Mb)

"Afghanistan-Tajikistan Bridge, Shir Khan, Afghanistan to Nizhniy Pyandzh, Tajikistan, 35% Design Submittal" (Drawings)” dated August 2004, Revision 2. (Format: ZIP of *.dwg files  Size: 10Mb)

"Afghanistan-Tajikistan Bridge, Shir Khan, Afghanistan to Nizhniy Pyandzh, Tajikistan, 35% Design Submittal" (Drawings)” dated August 2004, Revision 2. (Format: ZIP of *.dgn files  Size: 8Mb)


AVAILABLE PHOTOS
Click thumbnail to view full size